TM 5-5420-234-14&P
This task covers:
a. Removal
c. Installation
b. Cleaning and Inspection
d. Follow-on Maintenance
INITIAL SETUP
Tools and Special Tools
Tool Kit, General Mechanic's: Automotive
(SC 5180-90-N26)
Personnel Required
Materials/Parts
Two
Equipment Condition
a. Removal.
(1) Remove eight bolts (1) and lockwashers (2) and two guides (3) from winch frame (4). Discard
(2) Remove cotter pin (5) from roller pin (6). Remove roller pin (6), two spacers (7), and roller assembly
(8) from winch frame (4). Discard cotter pin.
8
7
4
7
5
1
6
2
3
2
1