TM 5-5420-234-14&P
NOTE
During all bridge bay operations, the operator will drive and be
responsible for the operation of the LHS cab control box. The assistant
acts as a ground guide and will be responsible for directing the operator
using hand signals, operating the remote control box and winch, and
assisting the operator as needed.
In case of emergency while the remote control is in use, push the
emergency stop switch to shut down operation of the LHS.
a.
The BAP must be loaded on the Transporter
before loading bridge bay.
b.
Make sure all bridge bay latches and locks are
locked and secured (refer to TM 5-5420-209-
12).
c
Put transmission in reverse, and back up
Transporter so there is about 5 feet (1.5 m) of
clearance between Transporter and lifting
hook end of bridge bay.
1
d.
Set parking brake, and place transmission in
neutral.
e.
Secure the BAP to the Transporter. Make sure
BAP hold-down lock handles (1) are pushed
in.
2
2
3
f.
Connect two BAP winch hydraulic pressure
hoses (2) to male connector and female
3
connector (3) located on bottom of hook arm
assembly.