TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
(9) Disconnect four heavy-duty winch
hydraulic hoses (26) from each other and
pull through hole in wrecker body.
(10) Remove dust cap (27) from fitting (28).
(11) Connect four heavy-duty winch
hydraulic hoses (26).
c. Follow-on Maintenance.
(1) Fill hydraulic reservoir (LO 9-2320-279 12).
(2) Operate crane and heavy-duty winch (TM 9-2320-279-10) to check operation of hydraulic pump
and check for leaks.
END OF TASK
17-28.2. POWER TAKE OFF REMOVAL/INSTALLATION (M984E1).
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Models
M984E1
Test Equipment
None
Special Tools
None
Supplies
Compound, sealing, pipe thread, Item 18,
Appendix C
Grease, automotive and artillery, Item 23,
Appendix C
Tags, identification, Item 48, Appendix C
Personnel Required
MOS 63S, Heavy wheel vehicle mechanic
References
None
Equipment Condition
TM or Para
Condition Description
LO 9-2320-279-12
Hydraulic reservoir drained.
Para 17-28.1
Hydraulic pump removed.
Special Environmental Conditions
None
General Safety Instructions
None
17-141