TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
NOTE
On some models, electrical leads are connected by an electrical plug and on others by
electrical terminals, lockwashers, and screws. If connected by electrical terminals, perform
steps (14) and (16) thru (18). If connected by an electrical plug perform steps (15) thru (18).
(14)
Install two wires (17), screws (17), and lockwashers (19).
(15)
Connect electrical plug (20).
(16)
Connect three hoses (21, 22, and 23).
(17)
Install preformed packing (24), hose (25), two plates (26), four screws (27), and
lockwashers (28).
(18)
Install preformed packing (29), hose (30), two plates (31), four screws (32), and
lockwashers (33).
NOTE
.
Trucks with guard, perform step (19).
.
Trucks with guard, ensure guard is fully seated under flat washers.
(19)
Install guard (34) under two flat washers (34.1), and tighten two screws (35) and
lockwashers (35.1).
c.
Follow-on Maintenance.
(1)
Fill hydraulic reservoir (LO 9-2320-279-12).
(2)
Install muffler (M983 with crane) (para 5-2).
(3)
Check operation of hydraulic pump and PTO (TM 9-2320-279-10).
(4)
Install front cargo panel (M977, M985) (TM 9-2320-279-10).
(5)
Install stowage box (M978) (para 16-34).
END OF TASK
Change 2
17-137
