TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
17-28.2 POWER TAKEOFF REMOVAL/INSTALLATION (M984E1) (CONT).
a.
Removal.
(1)
(2)
(2.1)
(3)
(4)
NOTE
Tag and mark hoses before disconnecting.
Disconnect three hoses (1, 2, and 3).
NOTE
Some models electrical leads are connected by electrical plug and some are connected by
electrical terminals, lockwashers, and screws.
If connected by electrical plug, perform
step (2). If connected by terminals,
lockwashers, and screws, perform step (2.1).
Disconnect connector (4).
Remove two screws (4.1), lockwashers (4.2), and wires (4.3)-
Remove five nuts (5) and washers (6)
from studs (7).
Remove screw (8).
CAUTION
After removing PTO and gasket, be sure to
cover access hole in transmission housing.
Dirt or foreign objects in transmission can
cause damage to parts.
(5)
Remove PTO (9) from transmission
housing (10).
(6)
Remove gasket (11) from transmission
housing (10).
17-142
Change 2