TM 5-5420-234-14&P
4-45. BAP AIR LINES AND FITTINGS REPLACEMENT (continued).
(22) Using two tube nuts (17), connect tubing (18) to adapter (19) and tube nipple (13).
(23) Install pipe coupling (9) and adapter (12) on BAP frame.
(24) Install tubing (11) on
BAP frame with six loop clamps (16),
new lockwashers (15),
and nuts (14).
(25) Using two tube nuts (10), connect tubing (11) to tube nipple (13) and adapter (12).
(26) Install elbow (7) on pipe coupling (9).
(27) Install tubing (4) on BAP frame with loop clamp (3), new lockwasher (2), and nut (1).
(28) Using two tube nuts (5 and 6), connect tubing (4) to two elbows (7 and 8).
c. Follow-on Maintenance:
Load BAP onto Transporter and connect air system (para 2-9).
Check air system for leaks.
END OF TASK
445519
- - 15