TM 5-5420-234-14&P
Section VII. TRANSPORTER MAINTENANCE PROCEDURES
Sections VI and VII of this chapter contain instructions for replacement and repair of Common Bridge Transporter (CBT)
System components authorized by the Maintenance Allocation Chart at the Unit maintenance level. Maintenance
procedures for the Transporter are in this section, and maintenance procedures for the Bridge Adapter Pallet (BAP) are
in Section VI. In some cases, components must be removed before performing the task. In these cases, references are
provided to other chapters or paragraphs within this manual.
This task covers:
a.
Removal
b. Installation
c.
Follow-on Maintenance
INITIAL SETUP
Tools and Special Tools:
Equipment Condition:
Tool Kit, General Mechanic's: Automotive
(SC 5180-90-N26)
Engine turned off (TM 9-2320-279-10)
Wheels chocked (TM 9-2320-279-10)
Materials/Parts:
a. Removal.
NOTE
There are two ladder brackets. Both brackets are removed the same way.
(1) Remove two locknuts (1), screws (2), and ladder bracket (3) from vehicle (4). Discard locknuts.
NOTE
Perform Step 2 only if rubber pads are damaged.
(2) Remove and discard two rubber pads (5) from vehicle (4).