TM 5-5420-234-14&P
This task covers:
a.
Removal
b. Installation
c. Follow-on Maintenance
INITIAL SETUP
Tools and Special Tools
Personnel Required
Tool Kit, General Mechanic's: Automotive
Two
(SC 5180-90-N26)
Equipment Condition
Materials/Parts
NOTE
This procedure is for either curb-side or road-side transload roller replacement.
Road side is shown.
a. Removal.
(1) Remove-quick release pin (1) from transloader bracket (2). Remove screw (3) and lanyard (4) from BAP
frame (5).
5
~
2
1
3
4