TM 5-5420-234-14&P
4-32. BAP TRANSLOAD ROLLER REPLACEMENT (continued).
(2) Remove cotter pin (6) from straight pin (7). Discard cotter pin.
NOTE
The straight pin is removed by pulling it toward the outside of the BAP.
(3) While an assistant supports transload roller (8) and transloader bracket (2), remove straight pin (7) from
welded bracket on frame (5) by pulling it toward the outside of the BAP.
(4) Remove screw (9), lockwasher (10), and retaining bar (11) from welded bracket on frame (5). Discard
lockwasher.
11
7
6
5
10
9
2
8
(5) Remove spring pin (12) and transloader
collar (13) from headed pin (14).
12
2
Discard spring pin.
(6) Remove headed pin (14) and roller (8)
from transloader bracket (2).
(7) Lubricate straight pin (7) and headed pin
13
b. Installation.
(1) Install headed pin (14) in bracket (2),
roller (8), and transloader collar (13),
making sure holes in transloader collar
(13) and headed pin (14) align.
14
8
(2) Install new spring pin (12) in holes in
transloader collar (13) and headed pin
(14).
4-449