TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
b. Installation.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
Install two elbow fittings (1)
in hose reel (2).
Install two hoses (3 and 4)
and preformed packings (5)
in elbow fittings (1).
Install hose reel (2) with
three lockwashers (6) and
nuts (7).
Install two fittings (8) on
hose reel (2).
Install two hoses (9 and 10)
and preformed
packings (11) in fittings (8)
on hose reel (2).
Wind hoses (9 and 10) on
reel (2).
Install two hoses (9 and 10) and preformed
packings (12) in couplings (13) at top of
boom (14).
Install two hoses (3 and 4) and preformed
packings (15) in lower hose couplings (16).
c. Follow on Maintenance.
(1) Check operation of hose reel
(TM 9-2320-279-10).
(2) Check for leaks.
(3) Return crane to stowed position
(TM 9-2320-279-10).
END OF TASK
17-103