TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
17-21.1. CRANE BOOM REPAIR (CONT).
c. Assembly.
(1) Install two grease fittings (1) in pin (2).
(2) Apply grease to two bushings (3) and
install in sheaves (4).
(3) Soldier A and Soldier B install two
sheaves (4) in boom (5) with pin (2).
(4)
(5)
Install two spacers (6) in pins (7).
Install two pins (7) in boom (5) with two
washers (8), lockwashers (9), and
screws (10).
d. Follow-on Maintenance. Crane hoist cable installed (para 17-18).
END OF TASK
17-100