b. Installation.
(1) Install cable (1) through fairlead (2).
(2) Install cable (1) on sheave (3).
CAUTION
Cable must be installed around drum in the exact position shown to avoid
possible damage to equipment. Hold tension roller down as close to center as
possible to prevent damage to roller.
NOTE
Until U-bolt is seated around cable, as one nut is tightened, the other will loosen
slightly.
(3) Hold tension roller (4) down and install cable (1) on drum hub (5) with U-bolt (6) and two
nuts (7). Tighten nuts alternately and evenly until both nuts are tight.
(4) If a new cable was installed, go to c: New Cable Break-in, otherwise go to d: Follow-on
Maintenance.