Winches,
e. Installation.
TM 9-2320-279-20-2
Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
(1) Install tensioner (1) with eight screws (2), washers (3), and locknuts (4) on winch (5).
(2) Install two eye bolts (6), washers (7), and locknuts (8), on springs (9).
(3) Tighten locknut (8) until 2.25 inch (57.1 mm) measurement is obtained.
f. Follow-on Maintenance. None.
END OF TASK
17-12. HEAVY-DUTY WINCH HYDRAULIC TUBES REMOVAL/INSTALLATION (M984).
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Models
References
M984
None
Test Equipment
Equipment Condition
None
TM or Para
Condition Description
Special Tools
LO 9-2320-279-12 Hydraulic reservoir drained.
None
Special Environmental Conditions
Supplies
None
None
General Safety Instructions
Personnel Required
None
MOS 63S, Heavy wheel vehicle mechanic
17-63