TM 5-5420-234-14&P
5-2. DIRECT SUPPORT TROUBLESHOOTING (continued).
Section II. BRIDGE ADAPTER PALLET MAINTENANCE PROCEDURES
Sections II and III contain instructions for replacement and repair of Common Bridge Transporter (CBT)
components authorized at the Direct Support level by the Maintenance Allocation Chart. In some
cases, components must be removed before performing the task. In these cases, references are
provided to the applicable chapters or paragraphs. This section contains the Bridge Adapter Pallet
(BAP) winch repair task. The task encompasses removal, disassembly, assembly, and installation
procedures for the brake hub assembly, final drive assembly, brake housing, and cable drum assembly,
as well as cleaning and inspection procedures. Section III contains maintenance procedures for the
Transporter.
This task covers:
a.
Brake Hub Assembly Removal
g.
Cable Drum Assembly Installation
b.
Brake Hub Subassembly Disassembly
h.
Brake Housing Installation
c.
Final Drive Assembly Removal
i.
Final Drive Assembly Installation
d.
Brake Housing Removal
j.
Brake Hub Subassembly Assembly
e.
Cable Drum Assembly Removal
k.
Brake Hub Assembly Installation
f.
Cleaning and Inspection
l.
Follow-on Maintenance
INITIAL SETUP
Tools and Special Tools
Arbor Press (11671961)
Pliers, Retaining Ring, 6 1/2 in. (7083704)
Pliers, Retaining Ring, 1 1/2 in. (T161-2)
Shop Equipment, Automotive (SC 4910-95-A31)
Tool Kit, General Mechanic's: Automotive
(SC 5180-90-N26)
Wrench Set, Socket (51200017510)
Personnel Required
Wrench, Torque, 15-75 ft-lb (GGG-W-00686)
Two
Materials/Parts
Equipment Condition
Winch on work table