TM 5-5420-234-14&P
2-11. LOADING BRIDGE BAY FROM THE GROUND (continued).
17
l.
Install remote control unit (14):
15
16
(1)
Remove remote control unit (14) and cable
(16) from stowage box (15).
(2)
Connect cable (16) to curb-side or road-side
LHS receptacle (17).
m . Turn HIGH IDLE switch (18) on remote control unit
18
(14) to ON.
14
CAUTION
While moving LHS hook arm rearward, make sure
winch hydraulic hoses are not trapped or damaged.
Operating equipment with trapped or damaged
hydraulic hoses will cause damage to equipment.
21
n. Position HOOK ARM switch (19) to UNLOAD and release when
hook arm cylinders (20) are extended approximately 6 inches (15 cm).
o. Position MAIN FRAME switch (21) to
UNLOAD and release when main
frame has moved rearward and winch
es
ch )
cable hook (22) is about 2 feet (0.6 m)
in
6 5 cm
above bridge bay lifting eye (23).
(1
22
23
WARNING
Always wear leather gloves
when handling winch cable.
Handling winch cable with
bare hands could result in
injury to personnel.
The cable drum requires a
minimum of three or four
wraps of wire rope (cable)
18
for safety. Failure to obey
this warning could result in
death or injury to personnel
or damage to equipment.
p. While an assistant maintains tension on winch cable, position
24
remote WINCH switch (24) to OUT and release when winch
21
cable hook (22) can be attached to bay lifting eye (23).
19
2-51