TM 9-2320-279-34-2
Winch Maintenance Instructions (Cont)
16-13.1. HEAVY-DUTY WINCH HYDRAULIC MOTOR REMOVAL/lNSTALLATION (CONT).
(5) Install preformed packing (12) and connector (13) on elbow (14).
(6) Install preformed packing (15) and connector assembly (16) with two clamp halves (17), four
lockwashers (18), and screws (19) to motor (8).
(7) Install pin (20) in coupling (21).
(8) Attach suitable lifting device to motor (8).
(9) Install coupling (21), gasket (22), and motor (8) on winch (23) with four lockwashers (24) and
screws (25).
(10) Connect three hydraulic lines (26, 27, and 28) to motor (8).
(11) Connect hydraulic line (29) to motor (8).
c. Follow-on Maintenance. Counterbalance valve installed (para 16-12).
END OF TASK
16-46.2