TM 9-2320-279-34-2
Cab and Body Maintenance Instructions (Cont)
b. Installation.
(1) Soldier A installs front mounting bracket (14) and four screws (13) while Soldier B installs four
nuts (12).
(2) Soldier A installs two washers (11), sleeves (10), springs (9), and screws (8) while Soldier B
installs two nuts (7).
(3) Repeat steps (1) and (2) to install front mounting bracket (14) on left side of vehicle.
(4) Soldier A installs rear mounting brackets (6) and three screws (5) while Soldier B installs three
nuts (4).
(5) Install two screws (3), washers (2), and nuts (1).
c. Follow-on Maintenance.
(1) Install fuel tank (TM 9-2320-279-20).
(2) Install battery box (TM 9-2320-279-20).
END OF TASK
15-18. WOOD SILL REMOVAL/INSTALLATION (M984).
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Models
References
M984
None
Test Equipment
Equipment Condition
None
TM or Para
Condition Description
Special Tools
Para 15-16
Wrecker body removed.
Driver, Torx Head FTX30A2
Special Environmental Conditions
Supplies
None
Wood, Item 68, Appendix C
General Safety Instructions
Personnel Required
None
MOS 63W, Wheel vehicle repairer
Level of Maintenance
Direct Support
15-79
