TM 9-2320-279-20-3
Chemical, Biological, and Radiological (CBR) Equipment Maintenance Instructions (Cont)
26-4. GAS PARTICULATE FILTER UNIT (GPFU) REMOVAL/INSTALLATION (CONT).
(20) Soldier A installs and holds
four screws (50), ground
wire (43), heater (51), and
four washers (52) while
Soldier B installs four
lockwashers (53) and
nuts (54).
(21) Install hoses (55 and 56) with two
clamps (57).
(22) Connect wire (58).
2 6 - 26