TM 9-2320-279-20-3
Chemical, Biological, and Radiological (CBR) Equipment Maintenance Instructions (Cont)
26-4. GAS PARTICULATE FILTER UNIT (GPFU) REMOVAL/iNSTALLATION (CONT).
(1)
(2)
(3)
b. Installation.
Install wire (1) on circuit
breaker No. 4 (2) with
lockwasher (3) and nut (4).
Install circuit breaker
with two screws (6),
lockwashers (7), and
nuts (8).
(5)
Install wires (1 and 9) with
two screws (10) and
lockwashers (11).
26-22