TM 9-2320-279-20-3
Chemical, Biological, and Radiological (CBR) Equipment Maintenance Instructions (Cont)
26-4. GAS PARTICULATE FILTER UNIT (GPFU) REMOVAL/INSTALLATION (CONT).
(8)
(9)
(10)
(11)
Install heater compartment
covers (21 and 22) with
11 screws (23).
Install hanger (24) with
screw (25).
Install valve (26) and
connector (27) with retaining
ring (28).
Install hose (29) with clamp (30)
and clip (31).
26-24