TM 9-2320-279-20-3
M983 Auxiliary Electrical Power System Maintenance Instructions (Cont)
27-3. POWER DISTRIBUTION BOX AND BRACKET REMOVAL/INSTALLATION (M983).
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
ModelS
References
M983
None
Test Equipment
Equipment Condition
None
TM or Para
Condition Description
Special Tools
TM 9-2320-279-10 Shut off engine.
None
TM 5-6115-465-12 Power distribution box
Supplies
disconnected from generator.
None
Special Environmental Conditions
None
Personnel Required
MOS 63S, Heavy wheel vehicle mechanic
General Safety Instructions
None
a. Removal.
(1) Remove eight nuts (1),
lockwashers (2), and
screws (3).
(2) Remove power distribution
box (4) from power
distribution box brackets (5).
NOTE
Both sides of power distribution
box brackets are removed and
installed the same way.
(3) Remove two nuts (6),
lockwashers (7), and
screws (8).
(4) Remove power distribution
box bracket (5).
(1)
(2)
(3)
(4)
b. Installation.
Position power distribution
box bracket (5).
Install power distribution box
bracket (5) with two
screws (8), lockwashers (7),
and nuts (6).
Install power distribution
box (4) on power distribution
box brackets (5).
Install eight screws (3),
lockwashers (2), and nuts (1).
c. Follow-on Maintenance. Connect power distribution box to generator (TM 5-6115-465-12).
END OF TASK
27-3/(27-4blank)