TM 9-2320-279-20-3
Chemical, Biological, and Radiological (CBR) Equipment Maintenance Instructions (Cont)
26-3. M-13 DECONTAMINATION UNIT REMOVAL/INSTALLATION (CONT).
(2) Remove four nuts (3), lockwashers (4),
washers (5), screws (6), and two spacers (7)
from carrier (8).
(3) Remove four nuts (9), screws (10), and
carrier (8).
(4) Remove strap (1) from carrier (8).
(5) Remove two nuts (11), lockwashers (12), screws (13), and
bracket (14).
b. Installation.
(1) Install bracket (1) with two screws (2), lockwashers (3), and
nuts (4).
26-12