TM 9-2320-279-20-3
Chemical, Biological, and Radiological (CBR) Equipment Maintenance Instructions (Cont)
26-2. M-8 CHEMICAL ALARM KIT REMOVAL/INSTALLATION (CONT).
(5) Install ground wire (6) on
circuit breaker No. 4 (10)
with lockwasher (11) and
nut (12).
(6) Install ground wire (6) and wire (7) on
switch (1) with two lockwashers (13)
and screws (14).
26-8