17-17.1.
TM 5-725
TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
a. Removal.
WARNING
Always wear gloves when handling hoist cable to prevent injury to hands.
Remove cotter pin (1), nut (2), two washers (3), and screw (4) from clevis (5).
Remove clevis (5) from boom (6).
Drive out wedge (7), straighten cable (8) and remove from clevis (5).
17-83