TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
17-17.1. CRANE HOOK BLOCK, HOOK AND CLEVIS REMOVAL/REPAIR/INSTALLATION
(M984E1) (CONT).
e. Installation.
(1) Position cable (1) through hook block (2)
and sheave (3).
Position cable (1) through hole in clevis (4).
Make loop in cable (1) and position free end of cable through hole in clevis (4).
Install wedge (5) in cable loop. Drive wedge (5) in cable loop. Drive wedge and cable loop into
clevis (4).
Install clevis (4) on boom (6) with screw (7), two washers (8), nut (9), and cotter pin (10).
f. Follow-on Maintenance. Return crane to stowed position (TM 9-2320-279-10).
END OF TASK
17-88 PIN: 061589-004