TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
17-16. CRANE HOOK BLOCK AND HOOK REMOVAL/REPAIR/INSTALLATION (M983)
(CONT).
e. Installation.
f.
END OF TASK
17-78
(1) Install hook block housing (1) on hoist cable (para 17-20).
(2) Install pulleys (2) and spacer (3) in hook block (1).
(3) Install pin (4) through hook block (1).
(4) Install locking pin (5) and two screws (6).
NOTE
Install beveled end of spacer toward hook.
(5) Install two spacers (7) and hook (8) in hook block (1) with pin (9).
(6) Install locking plate (10) and two screws (11).
Follow-on Maintenance. Return crane to stowed position (TM 9-2320-279-10).