TM 5-5420-234-14&P
4-20.
BAP GENERAL AIR TUBING ASSEMBLY INSTRUCTIONS (continued).
b. Installation.
Install tube nut (2) and new flared tube sleeve (3) on end of tube (1), and install tube nut (2) on fitting (4). To finish installing
flared tube sleeve (3), tighten tube nut (2) by compressing flared tube sleeve (3).
4
2
1
3
2
c. Follow-on Maintenance:
Check air system for leaks.
END OF TASK
a.
Preparation. When unpacking items, remove all packing material, barrier paper, tape, plastic bags,
protective caps, and protective grease coatings. Handle and store removed components carefully.
b.
Adhesive Sealants and Sealing Compounds. Use sealants and sealing compounds as required in each
maintenance task.
c.
Torquing. Screws
and nuts must be tightened according to
the values given in Appendix I, or to
specific
values given in the maintenance tasks.
d.
Identification Tags. Put
hoses, tubes, lines, and electrical wiring in
place by
matching identification tags
and markings on equipment.
e.
Hoses, Air Lines, and Wiring. After installing hoses, air lines, and wiring, make sure they do not contact
moving parts or component edges. Secure in place, out of the way, with cable ties and cushion clips.