TM 5-5420-234-14&P
Table 3-1. Operator/Crew Troubleshooting (continued)
Malfunction
Test or Inspection
Corrective Action
2. BAP FRONT PIN LOCK AIR RELEASE WILL NOT OPERATE DURING LAUNCH OF
BRIDGE BAY.
2
1
STEP 1.
Make sure BAP air line quick-disconnect connector (1) is properly connected to CBT air
system quick-disconnect connectors (2).
Disconnect and reconnect quick-disconnect connector (1).
If locks do not work or if an air leak is heard, notify Unit maintenance.
If front pin locks do not work during air-release procedure, manually release front
locks to deploy bridge bay (para 2-12). Notify Unit maintenance upon completion
of mission.