a. Check transfer site for 22 feet (6.7 m) overhead clearance, ground firmness, and level within one percent
slope in all directions.
b.
Align Transporter with the BAP, and back up Transporter. Stop approximately 5 feet (1.5 m) from the BAP.
c.
Apply service brake or parking brake and place transmission in neutral.
d. If the BAP is loaded, make sure load is properly secured.
e.
Make sure winch frame is secured to the BAP. Make sure two winch frame locking levers (1) are in the up
position. If locking levers (1) are not up:
(1)
Remove lockpin (2) from each locking lever (1).
2
1
(2)
Swing locking lever (1) to the up position.
(3)
Insert lockpin (2) into locking lever (1).
f.
Make sure two hydraulic hoses (3) are secured to
the stowed location connections (4).
4