TM 5-5420-234-14&P
2-12. UNLOADING BRIDGE BAY TO THE GROUND (continued).
aa. Disconnect and stow remote control unit (6):
(1)
Disconnect cable (8) from curb-side or road-side LHS receptacle (9).
(2)
Coil and stow cable (8) in rear of stowage box (7).
(3)
Stow remote control unit (6) in stowage box (7).
9
8
7
6
WARNING
Keep hands and fingers clear of front pin lock assemblies when in the disengaged
position. Failure to follow this warning could result in injury to personnel.
ab. Secure curb-side and road-side front pin lock assemblies (16) to their inboard position.
15
(1)
Pull front pin lock assembly (16) toward
you while moving latch lever (15) to center
position.
(2)
Allow front pin lock assembly (16) to slide
inboard.
16
2-62