TM 5-5420-234-14&P
2-12. UNLOADING BRIDGE BAY TO THE GROUND (continued).
c.
Connect two winch hydraulic pressure line hoses (4) to male connector and female connector (5) located on
bottom of hook arm assembly.
4
4
5
5
d. Install remote control unit (6):
(1)
Remove remote control unit (6) and cable (8) from stowage box (7).
(2)
Connect cable (8) to curb-side or road-side LHS receptacle (9).
9
7
8
6
e.
Position Transporter with its rear 5 to 6 feet (1.53 to 1.83 m) from where rear of bridge bay is to sit on the
ground.
f.
Apply parking brake and place transmission in neutral.
2-56