TM 5-5420-234-14&P
2-9.
LOADING THE BAP FROM THE GROUND (continued).
e.
Connect two hydraulic hoses (9) to the
10
9
stowed location connections (10).
f.
If the BAP is loaded, make sure all bridge
latches are secured (refer to TM 5-5420-
11
209-12).
g. Make sure BAP hold-down locks (11) are
in the auto engage position (handle pushed
in).
h. Make sure PLS feet (12) are in the
stowed position (up).
12
2-38