TM 5-5420-234-14&P
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services (PMCS) (continued)
Item To
Not Fully Mission
Item
Check/
Interval
Procedure
Capable If:
No.
Service
28
After
BAP Air Lines,
Check air lines, hoses, and fittings for
Hoses, and Fittings leaks, dents, cracks, and kinks.
29
After
Control Valve
Inspect control valve (1), air hose (2),
and lines (3) for kinks or missing
hardware.
2
3
1
30
After
LHS Rollers
Check rollers (1) for damage and binding.
Any rollers are broken, missing, or
inoperative.
1
MODEL A SHOWN
2-33
Change 1