TM 9-2320-279-34-2
Frame Maintenance Instructions (Cont)
b. Installation.
NOTE
Install all screws and nuts before
tightening.
(1) Install crossmember
bracket (1), four screws (2)
and nuts (3).
NOTE
It maybe necessary to lift
gussets to install crossmembers.
(2)
(3)
(4)
(5)
(6)
(7)
Install crossmember (4) on
gussets (5). Aline holes in
gussets and crossmember.
Install crossmember (6) on
gussets (5). Aline holes in
gussets and crossmember (4
and 6).
Install three crossmember brackets (1), eight screws (7) and nuts (8).
Soldier A installs 12 screws (2) while Soldier B installs nuts (3). Do not tighten nuts.
Install 24 screws (9), nuts (10) and four clip brackets (11).
Soldier A tightens 48 nuts (3, 8 and 10) while Soldier B holds screws (2, 7, and 9).
c. Follow-on Maintenance.
(1) Install crane (para 17-3.1).
(2) Install left rear brake relay valve (TM 9-2320-279-20).
(3) Install tractor protection valve (TM 9-2320-279-20).
(4) Install torque rods on No. 3 and No. 4 axles (TM 9-2320-279-20).
(5) Install rear fenders (TM 9-2320-279-20).
NOTE
Install wheels and tires on No. 3 and No. 4 axles if removed (TM 9-2320-279-10).
END OF TASK
13-52.1