TM 9-2320-279-34-2
Frame Maintenance Instructions (Cont)
(7) Soldier A and Soldier B install eight screws (13) and
nuts (14) in left frame rail (2).
(8) Tighten nuts and screws installed in steps (4), (6),
and (7).
(9) Install wire harness (15) and air lines (16)
through rear tandem crossmembers (1
and 3).
(10) Install grommets (17) in crossmembers (1
and 3).
TA189199
NOTE
Do step (11) for M977 and M985 vehicles.
(11) Connect cargo body clearance light connector (18).
13-50