TM 9-2320-279-34-1
Change 5
6-15
Electrical System Maintenance Instructions (Cont)
Supplies
Sealant, RTV200 Electrical, Item 55.2,
Appendix C
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Personnel Required
MOS 63G, Fuel and electrical systems repairer
Equipment Condition
TM or Para
Condition Description
TM 9-2320-279-20 Starter removed.
References
None
Special Tools
None
6-3. STARTER SOLENOID REMOVAL/INSTALLATION.
Models
All
Test Equipment
None
Special Environmental Conditions
None
General Safety Instructions
None
Level of Maintenance
Direct Support
a. Removal.
(1)
Remove nut (1) and
lockwasher (2).
(2)
Disconnect ground lead (3)
from terminal (4).
(3)
Remove nut (5) from motor terminal (6).
(4)
Remove nut (7) from field terminal (8).