Winches, Cranes,
e. Installation.
WARNING
TM 9-2320-279-20-2
and Power Takeoff (PTO) Maintenance Instructions (Cont)
Always wear heavy gloves when handling
hoist cable to prevent injury to hands.
(1)
(2)
(3)
(4)
(5)
Put cable (1) through hook block (2).
Put cable (1) through hole in
clevis (3).
Make loop in cable (1) and put free
end of cable through second hole in
clevis (3).
Install wedge (4) in cable loop.
Drive wedge and cable loop into
clevis (3).
Install clevis (3) on boom nose (5) with
screw (6), nut (7), and cotter pin (8).
f. Follow-on Maintenance. Return crane to
stowed position (TM 9-2320-279-10).
END OF TASK
17-75