TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
17-31. CRANE LEFT AND RIGHT OUTRIGGER CONTROL LEVERS REMOVAL/lNSTALLATION
(M983) (CONT).
d. Left Side Outrigger Controls Installation.
NOTE
Both left outrigger controls are removed the same way.
(1) Install sleeve (1) in knob (2).
(2) Install knob (2) on lever (3).
(3) Install lever (3) in coupling (4).
(4) Install screw (5) and nut (6) in coupling (4).
e. Follow-on Maintenance. Stow outriggers (TM 9-2320-279-10).
END OF TASK
17-156