17-30. PTO SOLENOID REMOVAL/INSTALLATION (CONT).
(9) Attach wire (15) with electrical butt connector.
(10) Connect three hoses (16, 17, and 18).
c. Follow-on Maintenance.
(1) Start engine (TM 9-2320-279-10).
(2) Check operation of PTO unit and check for leaks
(TM 9-2320-279-10).
(3) Shut off engine (TM 9-2320-279-10).
(4) Install front cargo box panel (M977 and M985)
(TM 9-2320-279-10).
END OF TASK
Section VII. OUTRIGGERS AND OUTRIGGER CONTROLS
17-31. CRANE LEFT AND RIGHT OUTRIGGER CONTROL LEVERS REMOVAL/INSTALLATION
(M983).
This task covers:
a. Right Side Outrigger Controls Removal
d. Left Side Outrigger Controls Installation
b. Right Side Outrigger Controls Installation
e. Follow-on Maintenance
c. Left Side Outrigger Controls Removal
INITIAL SETUP
Models
References
M983
None
Test Equipment
Equipment Condition
None
TM or Para
Condition Description
Special Tools
TM 9-2320-279-10 Shut off engine.
None
TM 9-2320-279-10 Outrigger legs down.
Supplies
Special Environmental Conditions
None
None
Personnel Required
General Safety Instructions
MOS 63S, Heavy wheel vehicle mechanic
None
17-152