TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
17-33. OUTRIGGER BEAM ASSEMBLY COVER REMOVAL/INSTALLATION (CONT).
a.
b.
c.
Removal.
(1) Remove 12 nuts (1), lockwashers (2), and washers (3) from studs (4).
(2) Remove outrigger cover (5) from outrigger beam assembly (6).
Installation.
(1) Install outrigger cover (5) on outrigger beam assembly (6).
(2) Install 12 washers (3), lockwashers (2) and nuts (1) on studs (4).
Follow-on Maintenance. None.
END OF TASK
17-160