TM 5-5420-234-14&P
4-82. MAIN FRAME VALVE (LOAD) HARNESS REPLACEMENT (MODEL A ONLY)
(continued )
NOTE
5
7
11
Note position of rubber grommet
prior to removal.
(5) Remove nut (12), plastic insert (13) and
6
4
rubber grommet (14) from junction box (11)
(6) Remove main frame valve (load) harness
(15) from junction box (11).
8
9
(7) Loosen screw (16) and remove connector
(17) and gasket (18) from directional control
14
valve (19). Discard gasket.
10
13
(8) Remove nut (12), plastic insert (13), and
rubber grommet (14) from main frame
12
valve (load) harness (15).
15
b. Installation.
NOTE
OTHER WIRE HARNESSES REMOVED FOR CLARITY
Install cable ties as required.
Ensure rubber grommet is installed in same
position as noted during removal.
(1) Install rubber grommet (14), plastic insert (13), and nut
(12) on main frame valve (load) harness (15).
(2) Install new gasket (18) and connector (17) to directional
control valve (19) and tighten screw (16).
(3) Position main frame valve (load) harness (15) in junction
box (11).
(4) Install rubber grommet (14), plastic insert (13), and nut
(12) on junction box (11).
19
(5) Install junction box (11) on vehicle (19) with four screws
(10), washers (9) and new locknuts (8).
(6) Install black wire no. 16 (6) on terminal no. 16 (7) and
white wire no. 15 (4) on terminal no. 15 (5).
(7) Close junction box cover (3) and tighten four screws (2).
18
(8) Close hydraulic cabinet cover (1).
15
c. Follow-on Maintenance:
17
16
Connect batteries (TM 9-2320-279-20).
END OF TASK
4--628
4 628
Change 1