TM 5-5420-234-14&P
2-30. PREPARATION FOR EMERGENCY MANUAL REMOVAL OF THE BAP
(continued).
c.
Secure winch frame to the BAP. Make sure two winch
frame locking levers (1) are in the up position. If locking
2
1
(1)
Remove lockpin (2) from each locking lever (1).
(2)
Swing locking lever (1) to the up position.
(3)
Insert lockpin (2) into locking lever (1).
d. Connect two hydraulic hoses (3) to the stowed location
connections (4).
4
3
e.
If the BAP is loaded, inspect load and make sure it is secure.
CAUTION
The BAP hold-down locks must be unlocked from the LHS prior to starting BAP
unloading operations. Failure to release hold-down locks could result in
damage to equipment.
f.
Release BAP hold-down locks by pulling out handle (5).
5
2-142