TM 5-5420-234-14&P
2-27. MANUALLY LOADING THE BAP FROM THE GROUND (continued).
w. Steer Transporter under the BAP as the BAP rises to make sure BAP runners engage LHS rear rollers.
x. Apply service brake when BAP runners contact LHS rear rollers.
y.
Move joystick (7) to LOAD and release when main frame is fully stopped.
z.
Position HIGH IDLE switch (6) to OFF.
aa. Turn LHS MODE SELECT switch (5) to HOOK ARM ONLY (position 2).
ab. Position HIGH IDLE switch (6) to ON.
5
10
7
6
4
PTO ENGAGE
OFF
ON
HIGH IDLE
OFF
ON
NOTE
Hold joystick in LOAD position until the BAP is loaded.
ac. To move and lower hook arm to stowed position, move joystick (7) to LOAD and hold.