TM 9-2320-279-34-3
Special Purpose Kit Installation Instructions (Cont)
23-9. SHIPPING AND STORAGE CONTAINERS, ENGINE, TRANSMISSION AND TRANSFER
CASE PACKING AND UNPACKING.
This task covers:
a. Upper Container Removal
f. Transmission Installation
b. Upper Container Installation
g. Transfer Case Removal
c. Engine Removal
h. Transfer Case Installation
d. Engine Installation
i. Follow-on Maintenance
e. Transmission Removal
INITIAL SETUP
Models
Equipment Condition
All
TM or Para
Condition Description
Test Equipment
Para 23-11
Engine prepared for storage.
None
Para 23-12
Transmission prepared for
Special Tools
storage.
None
Special Environmental Conditions
Supplies
None
None
General Safety Instructions
None
Personnel Required
MOS 63W, Wheel vehicle repairer
Level of Maintenance
References
Direct Support
None
a. Upper Container Removal.
NOTE
All upper containers are
removed the same. Transmission
has 22 screws. Transfer case has
20 screws.
(1) Release air pressure at vent
valve (1).
(2) Remove 30 nuts (2),
washers (3), and screws (4).
WARNING
Keep out from under heavy
parts. Falling parts may cause
serious injury or death.
(3) Attach suitable lifting device
and remove upper
container (5) from lower
container (6).
23-59
