TM 9-2320-279-34-3
Special Purpose Kit Installation Instructions (Cont)
23-7. DECONTAMINATION KIT INITIAL INSTALLATION (CONT).
(2) Install strap (5) through
carrier (6).
(3) Install carrier (6) with four screws (7) and locknuts (8). Do not tighten.
(4) Install two spacers (9), four screws (10), washers (11), lockwashers (12), and nuts (13).
(5) Tighten screws (7 and 10).
23-50