Special Purpose Kit Installation Instructions (Cont)
Section V. CHEMICAL, BIOLOGICAL, AND RADIOLOGICAL (CBR)
TM 9-2320-279-34-3
EQUIPMENT
23-6. GAS PARTICULATE FILTER UNIT (GPFU) KIT INITIAL INSTALLATION.
This task covers:
a. Initial Installation
b. Follow-on Maintenance
INITIAL SETUP
Models
References
All
None
Test Equipment
Equipment Condition
None
TM or Para
Condition Description
Special Tools
TM 9-2320-279-20 Batteries disconnected.
None
Special Environmental Conditions
Supplies
None
Compound, sealing, pipe thread, Item 29,
Appendix C
General Safety Instructions
None
Personnel Required
MOS 63W, Wheel vehicle repairer (2)
Level of Maintenance
Direct Support
a. Initial Installation.
(1) Remove two plugs (1).
(2) Remove 11 screws (2) and lift
heater compartment covers (3
and 4).
23-40