22-7. FLOWMETER
TM 9-2320-279-34-3
M978 Tanker Maintenance Procedures lnstructions (Cont)
NOTE
Mark position of mounting bracket before removal.
(3) Remove two locknuts (6), screws (7), brackets (8),
and mounting bracket (5) from grating (9).
b . I n s t a l l a t i o n .
(1) Position screw (1) in mounting bracket (2).
(2) Position mounting bracket (2) on grating (3) and
install two brackets (4), screws (5), and locknuts (6).
(3) Position flowmeter (7) on mounting bracket (2).
(4) Install flowmeter (7) with two screws (1),
washers (8), and locknuts (9).
c. Follow-on Maintenance.
(1) Install tank level indicator gage (TM 9-2320-279-20).
(2) Install control junction box (TM 9-2320-27920).
(3) lnstall sampling probe valve (TM 9-2320-27920).
(4) Install flowmeter strainer (TM 9-2320-279-20).
(5) Install flowmeter register (para 22-6).
(6) Install V11 flow regulating valve (TM 9-2320-279-20).
(7) Install flowmeter to venturi assembly piping
(TM 9-2320-27920).
(8) Recirculate fuel (TM 9-2320-279-10).
(9) Inspect flowmeter for leaks and proper operation.
(10) Close pump module rear access doom
(TM 9-2320-279-10).
END OF TASK
22-34
