TM 9-2320-279-34-3
M977, M985, and M984E1 Crane Maintenance Instructions (Cont)
(13) Install spool (36), preformed packing (37), end cap (38), and four screws (39) in valve (40).
(14) Install spring (41), washer (42), preformed pakcing (43), preformed packing (44), and valve (45).
(15) Install preformed packing (46), screw (47), preformed packing (48), and plug (49).
(16) Install two preformed packings (50) and two preformed
packings (51) in valve (40).
(17) Install valve (40), two screws (52), two screws (53), two
caps (54), and two caps (55).
17-138.21