TM 9-2320-279-34-3
M977, M985, and M984E1 Crane Maintenance lnstructions (Cont)
d. Assembly.
(1) Install relief valve (1), spring (2), and setscrew (3) in valve body (4).
(2) Install preformed packing (5) and plug (6).
(3) Install preformed packing (7) and fitting (8) in valve body (4).
(4) Install preformed packing (9), fitting (10), tee fitting (11), and cap (l2).
17-138.19