(11)
(12)
TM 9-2320-279-34-3
M977, M985, and M984E1 Crane Maintenance Instructions (Cont)
Soldier A and Soldier B install rod
assembly (3) in cylinder (18).
Aline end cap (2) and install four screws (19).
NOTE
Apply lubricant to preformed packings before installing.
(13) Install preformed packing (20), backup ring (21),
preformed packing (22), backup ring (23), preformed
packing (24), and backup ring (23).
(14) Install holding valve (25).
(15) Install two fittings (26) and preformed
packings (27).
d. Follow-on Maintenance. Install
extension cylinder (para 17-18.1).
END OF TASK
C h a n g e 2 17-90.5